Application Details

16-Dec-2016

S/0204/16/CW

24-Dec-2016

27-Jun-2019

27-Jun-2019

Full Application (Waste)

31-Jul-2019

Barrington

Haslingfield Barrington Harlton

Haslingfield and The Eversdens Orwell and Barrington

Barrington Quarry, Haslingfield Road, Barrington, Cambs, CB22 7RQ View location map

Importation by rail and deposit of inert restoration material to restore former

Importation by rail and deposit of inert restoration material to restore former clay and chalk quarry

Decided

This application has been decided.

This application has already been decided. You cannot comment on it

Associated Media *

Description File Name
Site Location Plan SUBDOC0_2016_12_23_16_C018_BARR_001_Site_Location_Plan.pdf
Extent of Application Boundary SUBDOC0_2016_12_23_16_C018_BARR_002_D_Extent_of_Application_Boundary.pdf
Restoration Phasing Summary SUBDOC0_2016_12_23_16_C018_BARR_003_Restoration_Phasing_Summary.PDF
Vibration Monitoring Locations SUBDOC0_2016_12_23_16_C018_BARR_004_Vibration_Monitoring_Locations.pdf
Noise Monitoring Locations SUBDOC0_2016_12_23_16_C018_BARR_005_A_Noise_Monitoring_Locations.pdf
Material Designations SUBDOC0_2016_12_23_16_C018_BARR_006_Material_Designations.pdf
Retained Structures SUBDOC0_2016_12_23_16_C018_BARR_007_Retained_Structures.pdf
Planning Units SUBDOC0_2016_12_23_16_C018_BARR_008_Planning_Units.pdf
Area of Disturbance SUBDOC0_2016_12_23_16_C018_BARR_009_Area_of_Disturbance.pdf
Retention & Protection of Existing Vegetation SUBDOC0_2016_12_23_16_C018_BARR_010_Retention_&_Protection_Existing_Vegetation.pdf
Site Survey SUBDOC0_2016_12_23_16_C018_BARR_011_Site_Survey.PDF
Restoration Initial Developmenrt SUBDOC0_2016_12_23_16_C018_BARR_012_Restoration_Initial_Development.PDF
Restoration Phase 1A (plan) SUBDOC0_2016_12_23_16_C018_BARR_013_Restoration_Phase_1A.PDF
Restoration Phase 1B (plan) SUBDOC0_2016_12_23_16_C018_BARR_014_Restoration_Phase_1B.PDF
Restoration Phase 1C (plan) SUBDOC0_2016_12_23_16_C018_BARR_015_Restoration_Phase_1C.PDF
Restoration Phase 2 (plan) SUBDOC0_2016_12_23_16_C018_BARR_016_Restoration_Phase_2.PDF
Restoration Phase 3 (plan) SUBDOC0_2016_12_23_16_C018_BARR_017_Restoration_Phase_3.PDF
Restoration Phase 4 (plan) SUBDOC0_2016_12_23_16_C018_BARR_018_Restoration_Phase_4.PDF
Restoration Final Phase (plan) SUBDOC0_2016_12_23_16_C018_BARR_019_Restoration_Final_Phase.PDF
Restoration Final Works (plan) SUBDOC0_2016_12_23_16_C018_BARR_020_Restoration_Final_Works.PDF
Restoration Cross Sections (plan) SUBDOC0_2016_12_23_16_C018_BARR_021_Restoration_Cross_Sections.PDF
Extent of Clay Seal (plan) SUBDOC0_2016_12_23_16_C018_BARR_022_Extent_of_Clay_Seal.PDF
Combined Noise Exclusion Zones (plan) SUBDOC0_2016_12_23_16_C018_BARR_023_Combined_Noise_Exclusion_Zones.PDF
Site Context, Landscape Character, Viewpoint Locations (plan) SUBDOC0_2016_12_23_16_C018_BARR_024_Site_Context,_L'scape_Character,_Viewpt_Locns.pdf
Concept Surface Water Drainage Scheme (plan) SUBDOC0_2016_12_23_16_C018_BARR_025_Concept_Surface_Water_Drainage_Scheme.PDF
Final Restoration Plan SUBDOC0_2016_12_23_BARRIT15_Final_Restoration_Plan.pdf
Restored Quarry Sections AA to EE (plan) SUBDOC0_2016_12_23_BARRIT17_Restored_Quarry_Sections_AA_to_EE.pdf
Composite Restoration Masterplan SUBDOC0_2016_12_23_BARRIT19_Composite_Restoration_Masterplan.pdf
Restoration Habitat Areras Created (plan) SUBDOC0_2016_12_23_BARRIT22_Restoration_Habitat_Areas_Created.pdf
Biodiversity Checklist SUBDOC0_2016_12_23_Biodiversity_Checklist.pdf
Cover letter Cemex 21 Dec 2016 SUBDOC0_2016_12_23_Cover_letter_Cemex_21_Dec_2016.pdf
Environmental Statement SUBDOC0_2016_12_23_Environmental_Statement.pdf
Appendix A Noise Assessment SUBDOC0_2016_12_23_ES_Appendix_A_Noise_Assessment.pdf
Appendix B Vibration Assessment SUBDOC0_2016_12_23_ES_Appendix_B_Vibration_Assessment.pdf
Appendix C Traffic Statement SUBDOC0_2016_12_23_ES_Appendix_C_Traffic_Statement.pdf
Appendix D Ecology Assessment Appendices SUBDOC0_2016_12_23_ES_Appendix_D_Ecology_Assessment_Appendices.pdf
Appendix D Ecology Assessment SUBDOC0_2016_12_23_ES_Appendix_D_Ecology_Assessment.pdf
Appendix E Soil Resource Report SUBDOC0_2016_12_23_ES_Appendix_E_Soil_Resource_Report.pdf
Appendix F Geological Conservation Issues SUBDOC0_2016_12_23_ES_Appendix_F_Geological_Conservation_Issues.pdf
Appendix G Hydrogeological Impact Assessment SUBDOC0_2016_12_23_ES_Appendix_G_Hydrogeological_Impact_Assessment.pdf
Appendix H Flood Risk Assessment SUBDOC0_2016_12_23_ES_Appendix_H_Flood_Risk_Assessment.pdf
Appendix I Heritage Appraisal SUBDOC0_2016_12_23_ES_Appendix_I_Heritage_Appraisal.pdf
Appendix J Fig 2 Viewpoints 1 & 2 SUBDOC0_2016_12_23_ES_Appendix_J_Fig_2_Viewpoints_1_&_2.pdf
Appendix J Fig 3 Viewpoints 3 & 4 SUBDOC0_2016_12_23_ES_Appendix_J_Fig_3_Viewpoints_3_&_4.pdf
Appendix J Fig 4 Viewpoints 5 & 6 SUBDOC0_2016_12_23_ES_Appendix_J_Fig_4_Viewpoints_5_&_6.pdf
Appendix J Fig 5 Viewpoints 7 & 8 SUBDOC0_2016_12_23_ES_Appendix_J_Fig_5_Viewpoints_7_&_8.pdf
Appendix J Fig 6 Viewpoints 9 & 10 SUBDOC0_2016_12_23_ES_Appendix_J_Fig_6_Viewpoints_9_&_10.pdf
Appendix J Fig 7 Viewpoints 11 & 12 SUBDOC0_2016_12_23_ES_Appendix_J_Fig_7_Viewpoints_11_&_12.pdf
Appendix J Fig 1 Viewpoint Locations (plan) SUBDOC0_2016_12_23_ES_Appendix_J_Fig1_Viewpoint_Locations.pdf
Appendix J Landscape & Visual Impact Assessment SUBDOC0_2016_12_23_ES_Appendix_J_Landscape_&_Visual_Impact_Assessment.pdf
Appendix K Exhibition Board 1 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Board_1.pdf
Appendix K Exhibition Board 2 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Board_2.pdf
Appendix K Exhibition Board 3 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Board_3.pdf
Appendix K Exhibition Board 4 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Board_4.pdf
Appendix K Exhibition Board 5 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Board_5.pdf
Appendix K Exhibition Board 6 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Board_6.pdf
Appendix K Exhibition Flyer 1 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Flyer_1.pdf
Appendix K Exhibition Flyer 2 SUBDOC0_2016_12_23_ES_Appendix_K_Exhibition_Flyer_2.pdf
List of Appendices SUBDOC0_2016_12_23_ES_List_of_Appendices.pdf
ES Non Technical Summary SUBDOC0_2016_12_23_ES_Non_Technical_Summary.pdf
Local Validation List SUBDOC0_2016_12_23_Local_Validation_List.pdf
Supporting Statement App A BLR Operating Manual SUBDOC0_2016_12_23_Supporting_Statement_App_A_BLR_Operating_Manual.pdf
Supporting Statement App B Restoration & Outline Aftercare Scheme SUBDOC0_2016_12_23_Supporting_Statement_App_B_Restoration_&_Outline_Aftercare_Scheme.pdf
Supporting Statement App C SSSI Citation SUBDOC0_2016_12_23_Supporting_Statement_App_C_SSSI_Citation.pdf
Supporting Statement App D Feedstock Market Assessment SUBDOC0_2016_12_23_Supporting_Statement_App_D_Feedstock_Market_Assessment.pdf
Supporting Statement App E Approved Dust Control Scheme SUBDOC0_2016_12_23_Supporting_Statement_App_E_Approved_Dust_Control_Scheme.pdf
Supporting Statement SUBDOC0_2016_12_23_Supporting_Statement.pdf
Supporting Statement App F Proposed Vibration Monitoring Scheme SUBDOC0_2016_12_23_Supporting_Statement_App_F_Proposed_Vibration_Monitoring_Scheme.pdf
Supporting Statement App G Proposed Noise Monitoring Scheme SUBDOC0_2016_12_23_Supporting_Statement_App_G_Proposed_Noise_Monitoring_Scheme.pdf
Supporting Statement App I Press Article SUBDOC0_2016_12_23_Supporting_Statement_App_I_Press_Article.pdf
Supporting Statement App H Soil Handling Methodology SUBDOC0_2016_12_23_Supporting_Statement_App_H_Soil_Handling_Methodology.pdf
Application Form SUBDOC0_2016_12_23_Application_Form.pdf
from CCC Highways Engineer CON_2017_01_11_from_CCC_Highway_Engineer.pdf
from Environment Agency CON_2017_01_24_from_EA.pdf
from Foxton Parish Council CON_2017_01_23_from_Foxton_PC.pdf
from Archaeology CON_2017_01_24_from_Archaeology.pdf
from Foxton Parish Council CON_2017_01_26_from_Foxton_PC.pdf
from Barrington Parish Council CON_2017_01_28_from_Barrington_PC.pdf
from Haslingfield Parish Council CON_2017_01_26_from_Haslingfield_PC.pdf
from SCDC Planning CON_2017_01_31_from_SCDC_Planning.pdf
from CCC Flood & Water CON_2017_02_08_frpm_CCC_Flood_&_Water.pdf
from Natural England CON_2017_02_01_from_Natural_England.pdf
from Barrington Parish Council CON_2017_02_02_from_Barrington_PC.pdf
from The Wildlife Trust CON_2017_02_08_from_The_Wildlife_Trust.pdf
from Bendyshe Way Residents' Association CON_2017_01_30_from_Bendyshe_Way_Residents'_Association.pdf
from Bendyshe Way Residents' Association (attachment - petition) CON_2017_01_30_from_Bendyshe_Way_Residents'_Assoc_(attachment_-_petition).pdf
from CCC Ecology Officer CON_2017_03_29_from_CCC_Ecology_Officer.pdf
from Network Rail CON_2017_02_21_from_Network_Rail.pdf
10dB Review of ES Noise & Vibration CON_2017_07_25_10dB_review_of_ES_noise_&_vibration.pdf
from CCC Transport Assessmenrt team CON_2017_07_24_from_CCC_TA_team.pdf
Appendix A BLR Operating Manual SUBDOC2_2018_06_05_Appendix_A_BLR-OPERATING_MANUAL.pdf
Appendix A to the EcIA Addendum SUBDOC2_2018_06_05_APPENDIX_A_TO_THE_EcIA_ADDENDUM.pdf
Ecological Management Plan SUBDOC2_2018_06_05_BARRINGTON_ECOLOGICAL_MANAGEMENT_PLAN.pdf
Quarry Noise Report Rev 3a June 2018 SUBDOC2_2018_06_05_Barrington_Quarry_Noise_Report_rev3a_June_2018.pdf
Covering Letter explaining Supplementary Info SUBDOC2_2018_06_05_Covering_Letter_explaining_Supplementary_Info.pdf
Restoration Scheme Rev A SUBDOC2_2018_06_05_Drawing_BARRIT15_Rev_A_Restoration_Scheme.pdf
Composite Restoration Masterplan Rev A SUBDOC2_2018_06_05_Drawing_BARRIT19_Rev_A_Composite_Restoration_Masterplan.pdf
Ecology Addendum Avifauna Water Discharge into Cam SUBDOC2_2018_06_05_ECOLOGY_ADDENDUM_AVIFAUNA_WATER_DISCHARGE_INTO_CAM_CWS.pdf
Infiltration Basin Modelling SUBDOC2_2018_06_05_Infiltration_Basin_Modelling.pdf
MicroDrainage Modelling Technical Note June 2017 SUBDOC2_2018_06_05_MicroDrainage_modelling_Technical_Note_June_2017_v2.pdf
Restoration Outline Aftercare Scheme SUBDOC2_2018_06_05_Restoration_Outline_Aftercare_Scheme.pdf
from Lead Local Flood Auy CON_2018_06_18_from_LLFA.pdf
from Natural England CON_2018_06_19_from_Natural_England.pdf
from Environment Agency CON_2018_06_25_from_EA.pdf
from LLFA CON_2018_06_18_from_LLFA.pdf
from Foxton Parish Council CON_2018_06_27_from_Foxton_PC.pdf
from CCC Flood & Water CON_2017_06_28_from_CCC_Flood_&_Water.pdf
10dB Acoustics review of ES noise & vibration CON_2018_07_03_10dB_Acoustics_review_of_ES_noise_&_vibration.pdf
from Barrington Parich Council CON_2018_07_20_from_Barrington_Parish_Council.pdf
Attachment 1 - Cemex Ecology Officer comments CON_2018_07_27_Attachment_1-_Cemex_Ecology_Officer_comments.pdf
Atachment 2 - Planting & Conservation Strip Scheme CON_2018_07_27_Attachment_2_-_Planting_&_Conservation_Strip_Scheme.pdf
from PCC Wildlife Officer CON_2018_07_27_from_PCC_Wildlife_Officer.pdf
from SCDC Environmental Health Officer CON_2018_08_09_from_SCDC_Environmental_Health_Officer.pdf
from Bendyshe Way Residents' Association CON_2018_08_14_from_Bendyshe_Way_Residents'_Association.pdf
from County Wildlife Trust CON_2018_08_15_from_County_Wildlife_Trust.pdf
from Natural England CON_2018_08_15_from_Natural_England.pdf
from Lead Local Flood Authority CON_2018_12_20_from_LLFA_(CCC_Flood_&_Water_team).pdf
from Bendyshe Way Residents' Association CON_2018_09_17_from_Bendyshe_Way_Residents'_Association.pdf
from Barrington Parish Council CON_2018_09_19_from_Barrington_Parish_Council.pdf
from Bendyshe Way Residents' Association - Petition CON_2018_09_19_from_BWRA_-_Petition.pdf
from 10dB Acoustics CON_2018_09_20_from_10dB_Acoustics.pdf
letter - reconsultation on amended area GCOR_2019_05_16_CCC_letter_-_reconsultation_on_amended_area.pdf
amended drawing - Location Plan SUBDOC4_2019_05_15_amended_dwg_16_C018_BARR_001_A_-_Location_Plan.pdf
amended drawing - Boundary SUBDOC4_2019_05_15_amended_dwg_16_C018_BARR_002_E_-_Boundaries.pdf
amended drawing - Noise Monitoring SUBDOC4_2019_05_15_amended_dwg16_C018_BARR_005_B_-_Noise_Monitoring.pdf
from Cemex - cover letter SUBDOC4_2019_05_15_from_Cemex_-_cover_letter.pdf
from National Rail CON_2019_05_21_from_Network_Rail.pdf
from Natural England CON_2019_05_23_from_Natural_England.pdf
from Barrington Parish Council CON_2019_06_05_from_Barringon_PC.msg.pdf
from Foxton Parish Council CON_2019_06_10_from__Foxton_PC.pdf
Condition 2: dwg 16_C018_BARR_002_E Extent of Planning Application Boundary Condition_2_dwg_16_C018_BARR_002_E_Extent_of_Planning_Application_Boundary.pdf
Condition 10: dwg 16_C018_BARR_302 HGV Access Routes Condition_10_dwg_16_C018_BARR_302_HGV_Access_Routes.pdf
Condition 12: Ecological Management Plan Dec 2017 v2 Condition_12_Ecological_Management_Plan_Dec_2017_v2.pdf
Condition 19: dwg 16_C018_BARR_300_A Location of Stabling Points Condition_19_dwg_16_C018_BARR_300_A_Location_of_Stabling_Points.pdf
Condition 3: Written Restoration Outline Aftercare Scheme Rev A Nov 2017 Condition_3_Written_Restoration_Outline_Aftercare_Scheme_Rev_A_Nov_2017.pdf
Condition 34: dwg 19_C012_BARR_001 Preventing unauthorised access Condition_34_dwg_19_C012_BARR_001_Preventing_unauthorised_access.pdf
Condition 44 Dust Control Measures Condition_44_Dust_Control_Measures.pdf
Condition 51 Leachate management scheme Condition_51_Leachate_management_scheme.pdf
Condition 51 Leachate mangement scheme (dwg) Condition_51_Leachate_mangement_scheme_(dwg).pdf
Condition 53 dwg 16_C018_BARR_017 Restoration Phase 3 Condition_53_dwg_16_C018_BARR_017_Restoration_Phase_3.PDF
Condition 7 Barrington Light Railway Operating Manual April 2019 Condition_7_Barrington_Light_Railway_Operating_Manual_April_2019.pdf
Condition 8 Noise Monitoring Scheme 05 April 2019-rev7 Condition_8_Noise_Monitoring_Scheme_05_April_2019-rev7.pdf
Condition 9 Vibration Monitoring Scheme 21 Jan 2019 Condition_9_Vibration_Monitoring_Scheme_21_Jan_2019.pdf
Decision notice dwg showing Areas A, B, C & D Decision_notice_dwg_showing_Areas_A,_B,_C_&_D.pdf
DEC 2019 06 27 FINAL Decision Notice DEC_2019_06_27_FINAL_Decision_Notice.pdf

 

HTS Name: wphappdetail03-default.hts
Logical ID: WPHAPPDETAIL
jquery.js