Application Details

19-Dec-2017

S/3372/17/CW

20-Dec-2017

21-Sep-2018

21-Sep-2018

Full Application (Waste)

17-Oct-2018

Landbeach

Waterbeach Waterbeach

Levitt’s Field, Waterbeach Waste Management Park, Ely Road,, Waterbeach, Cambridge, CB25 9PQ View location map

Construction and development of a Waste Recovery Facility

Application for full planning permission for the construction and development of a Waste Recovery Facility (Waterbeach Waste Recovery Facility – WWRF) at Levitt’s Field, Waterbeach Waste Management Park (WWMP), Ely Road, Cambridge comprising the erection and operation of an Energy from Waste Facility to treat up to 250,000 tonnes of residual waste per annum, Air Cooled Condensers and associated infrastructure: including the development of an internal access road; office/welfare accommodation; workshop; car, cycle and coach parking; perimeter fencing; electricity sub-stations; weighbridges; weighbridge office; water tank; silos; lighting; heat off-take pipe; surface water management system; hardstanding; earthworks; landscaping; and bridge crossings.

Decided

This application has already been decided. You cannot comment on it

Associated Media *

Description File Name
Enviromental Statement Introduction SUBDOC0_2017_12_19_ES_V1_Chapter_01_Intro.pdf
Enviromental Statement Enviromental Impact Assesment Method SUBDOC0_2017_12_19_ES_V1_Chapter_02_EIA_Method.pdf
Enviromental Statement Alternatives SUBDOC0_2017_12_19_ES_V1_Chapter_03_Alternatives.pdf
Enviromental Statement Scheme Description and Construction Methods SUBDOC0_2017_12_19_ES_V1_Chapter_04_Scheme_Description_and_Construction_Methods.pdf
Enviromental Statement Landscape and Visual SUBDOC0_2017_12_19_ES_V1_Chapter_05_Landscape_and_Visual.pdf
Enviromental Statement Ecology and Nature Conservation SUBDOC0_2017_12_19_ES_V1_Chapter_06_Ecology_and_Nature_Conservation.pdf
Enviromental Statement Noise SUBDOC0_2017_12_19_ES_V1_Chapter_07_Noise.pdf
Enviromental Statement Air Quality SUBDOC0_2017_12_19_ES_V1_Chapter_08_Air_Quality.pdf
Enviromental Statement Surface Water and Flood Risk SUBDOC0_2017_12_19_ES_V1_Chapter_09_Surface_Water_and_Flood_Risk.pdf
Enviromental Statement Archaeology and Cultural Heritage SUBDOC0_2017_12_19_ES_V1_Chapter_10_Archaeology_and_Cultural_Heritage.pdf
Enviromental Statement Traffic SUBDOC0_2017_12_19_ES_V1_Chapter_11_Traffic.pdf
Enviromental Statement Socio Economics SUBDOC0_2017_12_19_ES_V1_Chapter_12_Socio_Economics.pdf
Enviromental Statement Summary SUBDOC0_2017_12_19_ES_V1_Chapter_13_Summary.pdf
Enviromental Statement Contents and Foreword SUBDOC0_2017_12_19_ES_V1_Contents_and_Foreword.pdf
Enviromental Statement V2 Fig 1.1 Site Location SUBDOC0_2017_12_19_ES_V2_Fig_1.1_Site_Location.pdf
Enviromental Statement V2 Fig 1.2 Site Context Plan SUBDOC0_2017_12_19_ES_V2_Fig_1.2_Site_Context_Plan.pdf
Enviromental Statement V2 Fig 1.3 Site Areas SUBDOC0_2017_12_19_ES_V2_Fig_1.3_Site_Areas.pdf
Enviromental Statement V2 Fig 10.1 Heritage Assets SUBDOC0_2017_12_19_ES_V2_Fig_10.1_Heritage_Assets.pdf
Enviromental Statement V2 Fig 10.2 Heritage Assets SUBDOC0_2017_12_19_ES_V2_Fig_10.2_Heritage_Assets.pdf
Enviromental Statement V2 Fig 10.3 Heritage Assets SUBDOC0_2017_12_19_ES_V2_Fig_10.3_Heritage_Assets.pdf
Enviromental Statement V2 Fig 10.4a Heat Offtake Routes North Area SUBDOC0_2017_12_19_ES_V2_Fig_10.4a_Heat_Offtake_Routes_North_Area.pdf
Enviromental Statement V2 Fig 10.4b Heat Offtake Routes South Area SUBDOC0_2017_12_19_ES_V2_Fig_10.4b_Heat_Offtake_Routes_South_Area.pdf
Enviromental Statement V2 Fig 11.1a 2022 Baseline Scenario 1 07:00-08:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.1a_2022_Baseline_Scenario_1_07.00-08.00.pdf
Enviromental Statement V2 Fig 11.1b 2022 Baseline Scenario 1 13:00-14:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.1b_2022_Baseline_Scenario_1_13.00-14.00.pdf
Enviromental Statement V2 Fig 11.1c 2022 Baseline Scenario 1 16:00-17:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.1c_2022_Baseline_Scenario_1_16.00-17.00.pdf
Enviromental Statement V2 Fig 11.1d 2022 Baseline Scenario 1 07:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.1d_2022_Baseline_Scenario_1_07.00-19.00.pdf
Enviromental Statement V2 Fig 11.1e 2022 Baseline Scenario 1 00:00-24:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.1e_2022_Baseline_Scenario_1_00.00-24.00.pdf
Enviromental Statement V2 Fig 11.2a 2022 Alternative Baseline Scenario 2 07:00-08:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.2a_2022_Alternative_Baseline_Scenario_2_07.00-08.0.pdf
Enviromental Statement V2 Fig 11.2b 2022 Alternative Baseline Scenario 2 13:00-14:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.2b_2022_Alternative_Baseline_Scenario_2_13.00-14.00.pdf
Enviromental Statement V2 Fig 11.2c 2022 Alternative Baseline Scenario 2 16:00-17:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.2c_2022_Alternative_Baseline_Scenario_2_16.00-17.00.pdf
Enviromental Statement V2 Fig 11.2d 2022 Alternative Baseline Scenario 2 07:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.2d_2022_Alternative_Baseline_Scenario_2_07.00-19.00.pdf
Enviromental Statement V2 Fig 11.2e 2022 Alternative Baseline Scenario 2 00:00-24:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.2e_2022_Alternative_Baseline_Scenario_2_00.00-24.00.pdf
Enviromental Statement V2 Fig 11.3a 2022 Baseline and Energy from Waste Scenario 3 07:00-08:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.3a_2022_Base_+_EfW_Scenario_3_07.00-08.00.pdf
Enviromental Statement V2 Fig 11.3b 2022 Baseline and Energy from Waste Scenario 3 13:00-14:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.3b_2022_Base_+_EfW_Scenario_3_13.00-14.00.pdf
Enviromental Statement V2 Fig 11.3c 2022 Baseline and Energy from Waste Scenario 3 16:00-17:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.3c_2022_Base_+_EfW_Scenario_3_16.00-17.0.pdf
Enviromental Statement V2 Fig 11.3d 2022 Baseline and Energy from Waste Scenario 3 07:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.3d_2022_Base_+_EfW_Scenario_3_07.00-19.00.pdf
Enviromental Statement V2 Fig 11.3e 2022 Baseline and Energy from Waste Scenario 3 00:00-24:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.3e_2022_Base_+_EfW_Scenario_3_00.00-24.00.pdf
Enviromental Statement V2 Fig 11.4a 2022 Alternative Baseline and Energy from Waste Scenario 4 07:00-08:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.4a_2022_Alternative_Base_+_EfW_Scenario_4_07.00-08.00.pdf
Enviromental Statement V2 Fig 11.4b 2022 Alternative Baseline and Energy from Waste Scenario 4 13:00-14:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.4b_2022_Alternative_Base_+_EfW_Scenario_4_13.00-14.00.pdf
Enviromental Statement V2 Fig 11.4c 2022 Alternative Baseline and Energy from Waste Scenario 4 16:00-17:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.4c_2022_Alternative_Base_+_EfW_Scenario_4_16.00-17.00.pdf
Enviromental Statement V2 Fig 11.4d 2022 Alternative Baseline and Energy from Waste Scenario 4 07:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.4d_2022_Alternative_Base_+_EfW_Scenario_4_07.00-19.00.pdf
Enviromental Statement V2 Fig 11.4e 2022 Alternative Baseline and Energy from Waste Scenario 4 00:00-24:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.4e_2022_Alternative_Base_+_EfW_Scenario_4_00.00-24.00.pdf
Enviromental Statement V2 Fig 11.5a 2020 Construction Yr Baseline 07:00-8:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.5a_2020_Con_Yr_Baseline_07.00-08.00.pdf
Enviromental Statement V2 Fig 11.5b 2020 Construction Yr Baseline 18:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.5b_2020_Con_Yr_Baseline_18.00-19.00.pdf
Enviromental Statement V2 Fig 11.5c 2020 Construction Yr Baseline 07:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.5c_2020_Con_Yr_Baseline_07.00-19.00.pdf
Enviromental Statement V2 Fig 11.5d 2020 Construction Yr Baseline 00:00-24:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.5d_2020_Con_Yr_Baseline_00.00-24.00.pdf
Enviromental Statement V2 Fig 11.6a 2020 Construction Yr Baseline and Peak Energy from Waste 07:00-8:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.6a_2020_Con_Yr_Base_+_Peak_EfW_Con_07.00-08.00.pdf
Enviromental Statement V2 Fig 11.6b 2020 Construction Yr Baseline and Peak Energy from Waste 18:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.6b_2020_Con_Yr_Base_+_Peak_EfW_18.00-19.00.pdf
Enviromental Statement V2 Fig 11.6c 2020 Construction Yr Baseline and Peak Energy from Waste 07:00-19:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.6c_2020_Con_Yr_Base_+_Peak_EfW_07.00-19.00.pdf
Enviromental Statement V2 Fig 11.6d 2020 Construction Yr Baseline and Peak Energy from Waste 00:00-24:00 SUBDOC0_2017_12_19_ES_V2_Fig_11.6d_2020_Con_Yr_Base_+_Peak_EfW_00.00-24.00.pdf
Enviromental Statement V2 Fig 12.1 Data Shine Commute SUBDOC0_2017_12_19_ES_V2_Fig_12.1_Data_Shine_MSOA_reach.pdf
Enviromental Statement V2 Fig 12.2 Socio-Economic Study Area SUBDOC0_2017_12_19_ES_V2_Fig_12.2_Socio_Economic_Study_Area.pdf
Enviromental Statement V2 Fig 4.1 Site Layout SUBDOC0_2017_12_19_ES_V2_Fig_4.1_Site_Layout.pdf
Enviromental Statement V2 Fig 4.10 Grid and Heat Offtake Connection Routes SUBDOC0_2017_12_19_ES_V2_Fig_4.10_Grid_and_Heat_Offtake_Connection_Routes.pdf
Enviromental Statement V2 Fig 4.2 Longitudinal Section SUBDOC0_2017_12_19_ES_V2_Fig_4.2_Longitudinal_Section.pdf
Enviromental Statement V2 Fig 4.3 South West & East Elevations SUBDOC0_2017_12_19_ES_V2_Fig_4.3_South_West_&_South_East_Elevations.pdf
Enviromental Statement V2 Fig 4.4 North West & North East Elevations SUBDOC0_2017_12_19_ES_V2_Fig_4.4_North_West_&_North_East_Elevations.pdf
Enviromental Statement V2 Fig 4.6 Landscape Design SUBDOC0_2017_12_19_ES_V2_Fig_4.6_Landscape_Design.pdf
Enviromental Statement V2 Fig 4.7 Construction Staffing Profile SUBDOC0_2017_12_19_ES_V2_Fig_4.7_Construction_Staffing_Profile.pdf
Enviromental Statement V2 Fig 4.9 Energy from Waste Indicative Process SUBDOC0_2017_12_19_ES_V2_Fig_4.9_EfW_Indicative_Process_Diagram.pdf
Enviromental Statement V2 Fig 5.1a Landscape and Visual Context SUBDOC0_2017_12_19_ES_V2_Fig_5.1a_Landscape_&_Visual_Context.pdf
Enviromental Statement V2 Fig 5.1b Landscape Character SUBDOC0_2017_12_19_ES_V2_Fig_5.1b_Landscape_Character.pdf
Enviromental Statement V2 Fig 5.1c Viewpoint Locations SUBDOC0_2017_12_19_ES_V2_Fig_5.1c_Viewpoint_Locations.pdf
Enviromental Statement V2 Fig 5.2a Viewpoints 1 and 3 SUBDOC0_2017_12_19_ES_V2_Fig_5.2a_Viewpoints_1_and_3.pdf
Enviromental Statement V2 Fig 5.2b Viewpoints 5 and 6 SUBDOC0_2017_12_19_ES_V2_Fig_5.2b_Viewpoints_5_and_6.pdf
Enviromental Statement V2 Fig 5.2c Viewpoints 7 and 8 SUBDOC0_2017_12_19_ES_V2_Fig_5.2c_Viewpoints_7_and_8.pdf
Enviromental Statement V2 Fig 5.2d Viewpoints 9 and 10 SUBDOC0_2017_12_19_ES_V2_Fig_5.2d_Viewpoints_9_and_10.pdf
Enviromental Statement V2 Fig 5.2e Viewpoints 11 and 12 SUBDOC0_2017_12_19_ES_V2_Fig_5.2e_Viewpoints_11_and_12.pdf
Enviromental Statement V2 Fig 5.2f Viewpoints 13 and 14 SUBDOC0_2017_12_19_ES_V2_Fig_5.2f_Viewpoints_13_and_14.pdf
Enviromental Statement V2 Fig 5.2g Viewpoints 15 and 16 SUBDOC0_2017_12_19_ES_V2_Fig_5.2g_Viewpoints_15_and_16.pdf
Enviromental Statement V2 Fig 5.2h Viewpoints 17 and 20 SUBDOC0_2017_12_19_ES_V2_Fig_5.2h_Viewpoints_17_and_20.pdf
Enviromental Statement V2 Fig 5.2i Viewpoints 22 and 24 SUBDOC0_2017_12_19_ES_V2_Fig_5.2i_Viewpoints_22_and_24.pdf
Enviromental Statement V2 Fig 5.2j Viewpoints 25 and 26 SUBDOC0_2017_12_19_ES_V2_Fig_5.2j_Viewpoints_25_and_26.pdf
Enviromental Statement V2 Fig 5.3a Photomontage VP7 SUBDOC0_2017_12_19_ES_V2_Fig_5.3a_Photomontage_VP7.pdf
Enviromental Statement V2 Fig 5.3b Photomontage VP10 SUBDOC0_2017_12_19_ES_V2_Fig_5.3b_Photomontage_VP10.pdf
Enviromental Statement V2 Fig 5.3c Photomontage VP17 SUBDOC0_2017_12_19_ES_V2_Fig_5.3c_Photomontage_VP17.pdf
Enviromental Statement V2 Fig 5.3d Photomontage VP20 SUBDOC0_2017_12_19_ES_V2_Fig_5.3d_Photomontage_VP20.pdf
Enviromental Statement V2 Fig 5.3e Photomontage VP22 SUBDOC0_2017_12_19_ES_V2_Fig_5.3e_Photomontage_VP22.pdf
Enviromental Statement V2 Fig 5.3f Photomontage VP25 SUBDOC0_2017_12_19_ES_V2_Fig_5.3f_Photomontage_VP25.pdf
Enviromental Statement V2 Fig 5.3g Photomontage VP26 SUBDOC0_2017_12_19_ES_V2_Fig_5.3g_Photomontage_VP26.pdf
Enviromental Statement V2 Fig 7.1 Baseling Sound Monitoring Positions SUBDOC0_2017_12_19_ES_V2_Fig_7.1_Baseline_Sound_Monitoring_Positions.pdf
Enviromental Statement V2 Fig 8.1 Site Location SUBDOC0_2017_12_19_ES_V2_Fig_8.1_Site_Location.pdf
Enviromental Statement V2 Fig 8.10 Wind Roses SUBDOC0_2017_12_19_ES_V2_Fig_8.10_Wind_Roses.pdf
Enviromental Statement V2 Fig 8.11 Annual Mean Nitrogen Dioxide SUBDOC0_2017_12_19_ES_V2_Fig_8.11_Annual_Mean_Nitrogen_Dioxide.pdf
Enviromental Statement V2 Fig 8.12 Annual Mean Benzene SUBDOC0_2017_12_19_ES_V2_Fig_8.12_Annual_Mean_Benzene.pdf
Enviromental Statement V2 Fig 8.13 Annual Mean 1,3 Butadiene SUBDOC0_2017_12_19_ES_V2_Fig_8.13_Annual_Mean_1,3-Butadiene.pdf
Enviromental Statement V2 Fig 8.14 Annual Mean Cadmium Screening SUBDOC0_2017_12_19_ES_V2_Fig_8.14_Annual_Mean_Cadmium_-_Screening.pdf
Enviromental Statement V2 Fig 8.15 Annual Mean Cadmium Worst Case SUBDOC0_2017_12_19_ES_V2_Fig_8.15_Annual_Mean_Cadmium_-_Worst_Case.pdf
Enviromental Statement V2 Fig 8.16 Annual Mean Cadmium Typical SUBDOC0_2017_12_19_ES_V2_Fig_8.16_Annual_Mean_Cadmium_-_Typical.pdf
Enviromental Statement V2 Fig 8.17 Acid Desposition Acid Grassland CL SUBDOC0_2017_12_19_ES_V2_Fig_8.17_Acid_Deposition_-_Acid_Grassland_CL.pdf
Enviromental Statement V2 Fig 8.18 Acid Desposition Neutral Grassland CL SUBDOC0_2017_12_19_ES_V2_Fig_8.18_Acid_Deposition_-_Neutral_Grassland_CL.pdf
Enviromental Statement V2 Fig 8.2 Dispersion Model SUBDOC0_2017_12_19_ES_V2_Fig_8.2_Dispersion_Model.pdf
Enviromental Statement V2 Fig 8.3 Air Quality Manamgement Areas SUBDOC0_2017_12_19_ES_V2_Fig_8.3_AQMAs.pdf
Enviromental Statement V2 Fig 8.4 Construction Dust Buffer Zones SUBDOC0_2017_12_19_ES_V2_Fig_8.4_Construction_Dust_Buffer_zones.pdf
Enviromental Statement V2 Fig 8.5 Background Monitoring Locations SUBDOC0_2017_12_19_ES_V2_Fig_8.5_Background_Monitoring_Locations.pdf
Enviromental Statement V2 Fig 8.6 Site Specific Diffusion Tubes SUBDOC0_2017_12_19_ES_V2_Fig_8.6_Site_Specific_Diffusion_Tubes.pdf
Enviromental Statement V2 Fig 8.7 Human Sensitive Receptor Locations SUBDOC0_2017_12_19_ES_V2_Fig_8.7_Human_Sensitive_Receptor_Locations.pdf
Enviromental Statement V2 Fig 8.8 Local Non-Statutory Ecological Receptors SUBDOC0_2017_12_19_ES_V2_Fig_8.8_Local_Non-Statutory_Ecological_Receptors.pdf
Enviromental Statement V2 Fig 8.9 European Designated Ecological Receptors SUBDOC0_2017_12_19_ES_V2_Fig_8.9_European_Designated_Ecological_Receptors.pdf
Enviromental Statement V2 Fig 9.1 Key Watercourses SUBDOC0_2017_12_19_ES_V2_Fig_9.1_Key_Watercourses.pdf
Enviromental Statement V2 Fig Illustrative Figures SUBDOC0_2017_12_19_ES_V2_Illustrative_Figures.pdf
Enviromental Statement V3 App 10.1 Gazetteer SUBDOC0_2017_12_19_ES_V3_App_10.1Gazetteer.pdf
Enviromental Statement V3 App 10.2 Scoped Out Designated Assets SUBDOC0_2017_12_19_ES_V3_App_10.2_scoped_out_designated_assets.pdf
Enviromental Statement V3 App 10.3 Non Designated Gazetteer V2 SUBDOC0_2017_12_19_ES_V3_App_10.3_Non_Designated_Gazetteer_V2.pdf
Enviromental Statement V3 App 10.4a Archaeological Excavation SUBDOC0_2017_12_19_ES_V3_App_10.4a.pdf
Enviromental Statement V3 App 10.4b Further Archaeological Investigations SUBDOC0_2017_12_19_ES_V3_App_10.4b.pdf
Enviromental Statement V3 App 10.4c The Hammerhead: Archaeological Excavation SUBDOC0_2017_12_19_ES_V3_App_10.4c.pdf
Enviromental Statement V3 App 10.4d Archaeological Investigations SUBDOC0_2017_12_19_ES_V3_App_10.4d.pdf
Enviromental Statement V3 App 10.4e Archaeological Watching Brief SUBDOC0_2017_12_19_ES_V3_App_10.4e.pdf
Enviromental Statement V3 App 10.4f Report on Archeological Geophysical Survey 2010 SUBDOC0_2017_12_19_ES_V3_App_10.4f.pdf
Enviromental Statement V3 App 2.1 Fly Sheets SUBDOC0_2017_12_19_ES_V3_App_2.1_Fly_Sheets.pdf
Enviromental Statement V3 App 2.1 Scoping Report SUBDOC0_2017_12_19_ES_V3_App_2.1_Scoping_Report.pdf
Enviromental Statement V3 App 2.2 Scoping Opinion SUBDOC0_2017_12_19_ES_V3_App_2.2_Scoping_Opinion.pdf
Enviromental Statement V3 App 5.1 Landscape and Visual Assesment Methodology SUBDOC0_2017_12_19_ES_V3_App_5.1_LVIA_Methodology.pdf
Enviromental Statement V3 App 5.2 Baseling Landscape Character SUBDOC0_2017_12_19_ES_V3_App_5.2_Baseline_Landscape_Character.pdf
Enviromental Statement V3 App 5.3 Viewpoint Selection SUBDOC0_2017_12_19_ES_V3_App_5.3_Viewpoint_Selection.pdf
Enviromental Statement V3 App 5.4 Effects on Landscape Character SUBDOC0_2017_12_19_ES_V3_App_5.4_Effects_on_Landscape_Character.pdf
Enviromental Statement V3 App 5.5 Effects on Viewpoints SUBDOC0_2017_12_19_ES_V3_App_5.5_Effects_on_Viewpoints.pdf
Enviromental Statement V3 App 5.6 Fig 1 VP17 Poplar Mitigation Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_1_VP17_Poplar_Mitigation_Photomontage.pdf
Enviromental Statement V3 App 5.6 Fig 2 VP7 Year 15 Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_2_VP7_Year_15_Photomontage.pdf
Enviromental Statement V3 App 5.6 Fig 3 VP10 Year 15 Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_3_VP10_Year_15_Photomontage.pdf
Enviromental Statement V3 App 5.6 Fig 4 VP17 Year 15 Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_4_VP17_Year_15_Photomontage.pdf
Enviromental Statement V3 App 5.6 Fig 5 VP20 Year 15 Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_5_VP20_Year_15_Photomontage.pdf
Enviromental Statement V3 App 5.6 Fig 6 VP22 Year 15 Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_6_VP22_Year_15_Photomontage.pdf
Enviromental Statement V3 App 5.6 Fig 7 VP25 Year 15 Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_7_VP25_Year_15_Photomontage.pdf
Enviromental Statement V3 App 5.6 Fig 8 VP26 Year 15 Photomontage SUBDOC0_2017_12_19_ES_V3_App_5.6_Fig_8_VP26_Year_15_Photomontage.pdf
Enviromental Statement V3 App 5.7 Draft Landscape and Ecological Management Plan SUBDOC0_2017_12_19_ES_V3_App_5.7_Draft_Landscape_and_Ecological_Management_Plan.pdf
Enviromental Statement V3 App 6.1 Baseline Ecological Surveys SUBDOC0_2017_12_19_ES_V3_App_6.1_Baseline_Ecological_Surveys.pdf
Enviromental Statement V3 App 6.2 Grid Connection Ecology Survey SUBDOC0_2017_12_19_ES_V3_App_6.2_Grid_Connection_Ecology_Survey.pdf
Enviromental Statement V3 App 7.1 Basic Acoustic Terminology SUBDOC0_2017_12_19_ES_V3_App_7.1_Basic_Acoustic_Terminology.pdf
Enviromental Statement V3 App 7.2 Noise Survey Details SUBDOC0_2017_12_19_ES_V3_App_7.2_Noise_Survey_Details.pdf
Enviromental Statement V3 App 7.3 Background Sound Survey Results SUBDOC0_2017_12_19_ES_V3_App_7.3_Background_Sound_Survey_Results.pdf
Enviromental Statement V3 App 7.4 Construction Plant Inventory SUBDOC0_2017_12_19_ES_V3_App_7.4_Construction_Plant_Inventory.pdf
Enviromental Statement V3 App 7.5 Assumed Noise Levels for Site Plant & Cladding Performance SUBDOC0_2017_12_19_ES_V3_App_7.5_Assumed_Noise_Levels_for_Site_Plant_&_Cladding_Perf.pdf
Enviromental Statement V3 App 7.6 Noise Mapping SUBDOC0_2017_12_19_ES_V3_App_7.6_Noise_Mapping.pdf
Enviromental Statement V3 App 7.7 Vibration Terminology SUBDOC0_2017_12_19_ES_V3_App_7.7_Vibration_Terminology.pdf
Enviromental Statement V3 App 7.8 Vibration Monitoring Details SUBDOC0_2017_12_19_ES_V3_App_7.8_Vibration_Monitoring_Details.pdf
Enviromental Statement V3 App 8.1 Baseline Review SUBDOC0_2017_12_19_ES_V3_App_8.1_Baseline_Review.pdf
Enviromental Statement V3 App 8.2 Process Emissions Modelling SUBDOC0_2017_12_19_ES_V3_App_8.2_Process_Emissions_Modelling.pdf
Enviromental Statement V3 App 8.3 Human Health SUBDOC0_2017_12_19_ES_V3_App_8.3_Human_Health.pdf
Enviromental Statement V3 App 9.1 Waterbeach Energy from Waste Flood Risk Assessment SUBDOC0_2017_12_19_ES_V3_App_9.1_Waterbeach_EFW_Flood_Risk_Assessment.pdf
Enviromental Statement V3 App 9.2 Waterbeach Energy from Waste Outline Drainage Strategy SUBDOC0_2017_12_19_ES_V3_App_9.2_Waterbeach_EFW_Outline_Drainage_Strategy.pdf
Enviromental Statement V3 Technical Appendices SUBDOC0_2017_12_19_ES_V3_Technical_Appendices.pdf
Application Form SUBDOC0_2017_12_19_Part_1_Application_Form.pdf
Article 13 Notice Final (signed) SUBDOC0_2017_12_19_Part_1_Article_13_Notice_Final_(signed).pdf
Cover Letter SUBDOC0_2017_12_19_Part_1_Cover_Letter.pdf
Letter Article 13 CCC Highways (signed) SUBDOC0_2017_12_19_Part_1_Letter_Article_13_CCC_Highways_(signed).pdf
Letter Article 13 CCC Waste (signed) SUBDOC0_2017_12_19_Part_1_Letter_Article_13_CCC_Waste_(signed).pdf
Letter Article 13 CCC Drainage Board (signed) SUBDOC0_2017_12_19_Part_1_Letter_Article_13_Drainage_Board_(signed).pdf
Waterbeach Design Evolution SUBDOC0_2017_12_19_Part_2_Waterbeach_Design_Evolution_Doc.pdf
Planning Statement Application Document SUBDOC0_2017_12_19_Part_3_Planning_Statement_Application_Document.pdf
Location Plan SUBDOC0_2017_12_19_Part_4_17013_PL01_Location_Plan.pdf
Exisiting Site Plan SUBDOC0_2017_12_19_Part_4_17013_PL02_Existing_Site_Plan.pdf
Proposed Site Plan SUBDOC0_2017_12_19_Part_4_17013_PL03_Proposed_Site_Plan.pdf
Floor Plans PL04 SUBDOC0_2017_12_19_Part_4_17013_PL04_Floor_Plans.pdf
Floor Plans PL05 SUBDOC0_2017_12_19_Part_4_17013_PL05_Floor_Plans.pdf
Floor Plans PL06 SUBDOC0_2017_12_19_Part_4_17013_PL06_Roof_Plan.pdf
Longitudinal Section SUBDOC0_2017_12_19_Part_4_17013_PL07_Longitudinal_Section.pdf
Cross Sections PL08 SUBDOC0_2017_12_19_Part_4_17013_PL08_Cross_Sections.pdf
Cross Sections PL09 SUBDOC0_2017_12_19_Part_4_17013_PL09_Cross_Sections.pdf
Cross Sections PL10 SUBDOC0_2017_12_19_Part_4_17013_PL10_Cross_Sections.pdf
Proposed South West Elevation SUBDOC0_2017_12_19_Part_4_17013_PL11_Proposed_South_West_Elevation.pdf
Proposed South West Elevation Colour SUBDOC0_2017_12_19_Part_4_17013_PL11_Proposed_South_West_Elevation_COLOUR.pdf
Proposed North West Elevation SUBDOC0_2017_12_19_Part_4_17013_PL12_Proposed_North_West_Elevation.pdf
Proposed North West Elevation Colour SUBDOC0_2017_12_19_Part_4_17013_PL12_Proposed_North_West_Elevation_COLOUR.pdf
Proposed North East Elevation SUBDOC0_2017_12_19_Part_4_17013_PL13_Proposed_North_East_Elevation.pdf
Proposed North East Elevation Colour SUBDOC0_2017_12_19_Part_4_17013_PL13_Proposed_North_East_Elevation_COLOUR.pdf
Proposed South East Elevation SUBDOC0_2017_12_19_Part_4_17013_PL14_Proposed_South_East_Elevation.pdf
Proposed South East Elevation Colour SUBDOC0_2017_12_19_Part_4_17013_PL14_Proposed_South_East_Elevation_COLOUR.pdf
Gatehouse SUBDOC0_2017_12_19_Part_4_17013_PL15_Gatehouse.pdf
Ancillary Buildings PL16 SUBDOC0_2017_12_19_Part_4_17013_PL16_Ancillary_Buildings.pdf
Ancillary Buildings PL17 SUBDOC0_2017_12_19_Part_4_17013_PL17_Ancillary_Buildings.pdf
Fencing and Gating Plan SUBDOC0_2017_12_19_Part_4_17013_PL18_Fencing_and_Gating_Plan.pdf
Beach Ditch Crossing SUBDOC0_2017_12_19_Part_4_17013_PL19_Beach_Ditch_Crossing.pdf
Heat Pipe Trench SUBDOC0_2017_12_19_Part_4_17013_PL20_Heat_Pipe_Trench.pdf
Cycle Shelter SUBDOC0_2017_12_19_Part_4_17013_PL21_Cycle_Shelter.pdf
Replacement Culverted Bridge SUBDOC0_2017_12_19_Part_4_17013_PL22_Replacement_Culverted_Bridge.pdf
Landscape Scheme SUBDOC0_2017_12_19_Part_4_1970-01-SK001_Landscape_Scheme.pdf
Site Areas SUBDOC0_2017_12_19_Part_4_PS_FIGURE_1.3_Site_Areas.pdf
Statement of Community Engagement Report SUBDOC0_2017_12_19_Part_5_SCI_REPORT.pdf
Appendix Staff & Visitor Traffic TA10 SUBDOC0_2017_12_19_Part_6_Appendix_TA10_(A4)_Staff_&_Visitor_Traffic.pdf
Appendix Insert TA10 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA10_INSERT_(A4).pdf
Appendix Tempro Growth Factors TA11 SUBDOC0_2017_12_19_Part_6_Appendix_TA11_(A4)_Tempro_Growth_Factors.pdf
Appendix Insert TA11 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA11_INSERT_(A4).pdf
Appendix Trip Distribution Diagrams TA12 SUBDOC0_2017_12_19_Part_6_Appendix_TA12_(A4)_Trip_Gen_for_Resi_Consents.pdf
Appendix Insert TA12 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA12_INSERT_(A4).pdf
Appendix CRP Traffic Estimates TA13 SUBDOC0_2017_12_19_Part_6_Appendix_TA13_(A4)_CRP_Traffic_Estimates.pdf
Appendix Trip Rate Calculation Selecation Parameters TA13 SUBDOC0_2017_12_19_Part_6_Appendix_TA13_(A4)_CRP_TRICS.pdf
Appendix Insert TA13 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA13_INSERT_(A4).pdf
Appendix ARCADY Summary TA14 SUBDOC0_2017_12_19_Part_6_Appendix_TA14_(A4)_ARCADY_SUMMARY.pdf
Appendix Insert TA14 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA14_INSERT_(A4).pdf
Appendix Insert TA15 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA15_INSERT_(A4).pdf
Appendix Insert TA16 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA16_INSERT_(A4).pdf
Appendix Insert TA17 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA17_INSERT_(A4).pdf
Appendix Construction Traffic TA18 SUBDOC0_2017_12_19_Part_6_Appendix_TA18_(A4)_Construction_Traffic.pdf
Appendix Insert TA18 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA18_INSERT_(A4).pdf
Appendix Insert TA19 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA19_INSERT_(A4).pdf
Appendix Axis Scoping Report TA1a SUBDOC0_2017_12_19_Part_6_Appendix_TA1a_(A4)_Axis_Scoping_Report.pdf
Appendix CCC Scoping Response TA1b SUBDOC0_2017_12_19_Part_6_Appendix_TA1b_(A4)_CCC_Scoping_Response.pdf
Appendix Axis Response to CCC Scope TA1c SUBDOC0_2017_12_19_Part_6_Appendix_TA1c_(A4)_Axis_Response_to_CCC_Scope.pdf
Appendix CCC Response TA1d SUBDOC0_2017_12_19_Part_6_Appendix_TA1d_(A4)_CCC_Response..pdf
Appendix Insert TA2 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA2_INSERT_(A4).pdf
Appendix Insert TA20 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA20_INSERT_(A4).pdf
Appendix Vehicle Swept Paths 1 TA2i SUBDOC0_2017_12_19_Part_6_Appendix_TA2i_(A3)_Vehicle_Swept_Paths_1.pdf
Appendix Vehicle Swept Paths 2 TA2ii SUBDOC0_2017_12_19_Part_6_Appendix_TA2ii_(A3)_Vehicle_Swept_Paths_2.pdf
Appendix Vehicle Swept Paths 3 TA2iii SUBDOC0_2017_12_19_Part_6_Appendix_TA2iii_(A3)_Vehicle_Swept_Paths_3.pdf
Appendix Vehicle Swept Paths 4 TA2iv SUBDOC0_2017_12_19_Part_6_Appendix_TA2iv_(A3)_Vehicle_Swept_Paths_4.pdf
Appendix Vehicle Swept Paths 5 TA2v SUBDOC0_2017_12_19_Part_6_Appendix_TA2v_(A3)_Vehicle_Swept_Paths_5.pdf
Appendix Vehicle Swept Paths 6 TA2vi SUBDOC0_2017_12_19_Part_6_Appendix_TA2vi_(A3)_Vehicle_Swept_Paths_6.pdf
Appendix Amey Waterbeach Travel Plan TA3 SUBDOC0_2017_12_19_Part_6_Appendix_TA3_(A4)_Amey_Waterbeach_WMP_Travel_Plan.pdf
Appendix Insert TA3 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA3_INSERT_(A4).pdf
Appendix Scenario 1 Mass Balance TA4 SUBDOC0_2017_12_19_Part_6_Appendix_TA4_(A3)_Scenario_1_Mass_Balance.pdf
Appendix Insert TA4 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA4_INSERT_(A4).pdf
Appendix Scenario 2 Mass Balance TA5 SUBDOC0_2017_12_19_Part_6_Appendix_TA5_(A3)_Scenario_2_Mass_Balance.pdf
Appendix Insert TA5 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA5_INSERT_(A4).pdf
Appendix Scenario 3 Mass Balance TA6 SUBDOC0_2017_12_19_Part_6_Appendix_TA6_(A3)_Scenario_3_Mass_Balance.pdf
Appendix Insert TA6 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA6_INSERT_(A4).pdf
Appendix Scenario 4 Mass Balance TA7 SUBDOC0_2017_12_19_Part_6_Appendix_TA7_(A3)_Scenario_4_Mass_Balance.pdf
Appendix Insert TA7 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA7_INSERT_(A4).pdf
Appendix Waterbeach HGV Profiles TA8 SUBDOC0_2017_12_19_Part_6_Appendix_TA8_(A4)_Waterbeach_HGV_Profile.pdf
Appendix Insert TA8 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA8_INSERT_(A4).pdf
Appendix Scenario HGV Profiles TA9 SUBDOC0_2017_12_19_Part_6_Appendix_TA9_(A4)_Scenario_HGV_Profiles.pdf
Appendix Insert TA9 SUBDOC0_2017_12_19_Part_6_APPENDIX_TA9_INSERT_(A4).pdf
Trans Site Location TA1 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA1_(A3)_Site_Location.pdf
Trans Site Masterplan TA10 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA10_(A3)_Site_Masterplan.pdf
Trans Process Diagram TA11 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA11_(A4)_Process_Diagram.pdf
Trans General Plan of Site Access TA12 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA12_(A4)_Gen_Plan_of_Site_Access.pdf
Trans 2016 & 2017 Weighbridge Records TA13 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA13_(A4)_2016&2017_weighbridge_records.pdf
Trans Traffic Assignments TA14 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA14_(A4)_Traffic_Assignment.pdf
Trans Additional Traffic Scenario 2 TA15 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA15_(A4)_Scen_2_Addn_Traffic.pdf
Trans Additional Traffic Scenario 3 TA16 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA16_(A4)_Scen_3_Addn_Traffic.pdf
Trans Additional Traffic Scenario 4 TA17 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA17_(A4)_Scen_4_Addn_Traffic.pdf
Trans 2022 Background Traffic TA18 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA18_(A4)_2022_Background_Traffic.pdf
Trans 2022 Committed Development Traffic TA19 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA19_(A4)_2022_Committed_Dev_Traffic.pdf
Trans BAse Traffic Diagrams TA2 - TA 6 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA2_to_TA6_(A4)_Base_Traffic_Diagrams.pdf
Trans 2022 Baseline Scenario 1 TA20 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA20_(A4)_2022_Baseline_(Scen_1).pdf
Trans 2022 Alternative Baseline Scenario 2 TA21 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA21_(A4)_2022_Alt_Baseline_(Scen_2).pdf
Trans 2022 Baseline and Energy from Waste Scenario 3 TA22 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA22_(A4)_2022_Baseline+EfW_(Scen_3).pdf
Trans 2022 Alternative Baseline and Energy from Waste Scenario 4 TA23 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA23_(A4)_2022_Alt_Baseline+EfW_(Scen_4).pdf
Trans Construction Graphs TA24 & TA25 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA24_&_TA25_(A4)_Construction_Graphs.pdf
Trans Energy from Waste Construction TA26 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA26_(A4)_EfW_Construction.pdf
Trans 2020 Baseline TA27 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA27_(A4)_2020_Baseline.pdf
Trans 2020 Baseline and Energy from Waste Construction TA28 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA28_(A4)_2020_Baseline_+_EfW_Con.pdf
Trans Pipleine Routes TA29 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA29_(A4)_Pipeline_Routes.pdf
Trans Personal Injury Accident Incidents Plan TA7 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA7_(A4)_PIA_Plan.pdf
Trans Walk and Cycle Catchment TA8 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA8_(A4)_Walk_Cycle_Catchment.pdf
Trans Bus Route TA9 SUBDOC0_2017_12_19_Part_6_Trans_Fig_TA9_(A4)_Bus_Route.pdf
Trans Appendix TA1 Insert SUBDOC0_2017_12_19_Part_6_Transport_APPENDIX_TA1_INSERT_(A4).pdf
Trans Assessment SUBDOC0_2017_12_19_Part_6_Transport_Assessment.pdf
Planning Statement Application 1.1 Validation Statement SUBDOC0_2017_12_19_Planning_Statement_App_1.1_Validation_Statement.pdf
Planning Statement Application 1.10 Phase 1 Desk Study SUBDOC0_2017_12_19_Planning_Statement_App_1.10_Phase_1_Desk_Study.pdf
Planning Statement Application 1.11 Biodiversity Checklist SUBDOC0_2017_12_19_Planning_Statement_App_1.11_Biodiversity_Checklist.pdf
Planning Statement Application 1.2 Sustainability Statement SUBDOC0_2017_12_19_Planning_Statement_App_1.2_Sustainabiltiy_Statement.pdf
Planning Statement Application 1.3 Daylight and Sunlight Assessment SUBDOC0_2017_12_19_Planning_Statement_App_1.3_Daylight_Sunlight_Assessment.pdf
Planning Statement Application 1.4 Mass Balance Summary SUBDOC0_2017_12_19_Planning_Statement_App_1.4_Mass_Balance_Summary.pdf
Planning Statement Application 1.5 Heat Plan SUBDOC0_2017_12_19_Planning_Statement_App_1.5_Heat_Plan.pdf
Planning Statement Application 1.6 Carbon Assessment SUBDOC0_2017_12_19_Planning_Statement_App_1.6_Carbon_Assessment.pdf
Planning Statement Application 1.7 Lighting Assessment Resident Receptor Location Plan SK-1 SUBDOC0_2017_12_19_Planning_Statement_App_1.7_Lighting_Assessment_RERC_SK-01.PDF
Planning Statement Application 1.7 Lighting Assessment Ecological Receptor Location Plan SK-2 SUBDOC0_2017_12_19_Planning_Statement_App_1.7_Lighting_Assessment_RERC_SK-02.PDF
Planning Statement Application 1.7 Lighting Assessment Heritage Receptor Location Plan SK-3 SUBDOC0_2017_12_19_Planning_Statement_App_1.7_Lighting_Assessment_RERC_SK-03.PDF
Planning Statement Application 1.7 Lighting Assessment Light Monitoring Location Plan SK-4 SUBDOC0_2017_12_19_Planning_Statement_App_1.7_Lighting_Assessment_RERC_SK-04.PDF
Planning Statement Application 1.7 Lighting Assessment Outline Scheme of Lighting SK-5 SUBDOC0_2017_12_19_Planning_Statement_App_1.7_Lighting_Assessment_RERC_SK-05.pdf
Planning Statement Application 1.7 Lighting Assessment Light Spill SK-6 SUBDOC0_2017_12_19_Planning_Statement_App_1.7_Lighting_Assessment_RERC_SK-06.PDF
Planning Statement Application 1.7 Lighting Assessment SUBDOC0_2017_12_19_Planning_Statement_App_1.7_Lighting_Assessment.pdf
Planning Statement Application 1.8 Site Waste Management Plan SUBDOC0_2017_12_19_Planning_Statement_App_1.8_Site_Waste_Management_Plan.pdf
Planning Statement Application 1.9 Arboriculture Survey SUBDOC0_2017_12_19_Planning_Statement_App_1.9_Arboricultural_Survey.PDF
Planning Statement Application 1.9a Tree Location and Constraints SUBDOC0_2017_12_19_Planning_Statement_App_1.9a_Tree_Location_and_Constraints.PDF
Enviromental Assessment V4 Non Technical Summary SUBDOC0_2017_12_19_ES_V4_Non_Technical_Summary.pdf
Appendix 2017 Background TA15 SUBDOC0_2017_12_19_Part_6_Appendix_TA15_(A4)_-_2017_Backgound.pdf
Appendix 2022 Scenarios 1 & 3 TA 16 SUBDOC0_2017_12_19_Part_6_Appendix_TA16_(A4)_-_2022_Scenarios_1_&_3.pdf
Appendix 2022 Scenarios 2 & 4 TA17 SUBDOC0_2017_12_19_Part_6_Appendix_TA17_(A4)_-_2022_Scenarios_2_&_4.pdf
Appendix 2020 Energy from Waste Construction TA19 SUBDOC0_2017_12_19_Part_6_Appendix_TA19_(A4)_-_2020_EfW_Construction.pdf
from Lead Local Flood Authority CON_2018_01_05_from_LLFA.pdf
from Cambridge International Airport CON_2018_01_05_from_Cambridge_International_Airport.pdf
Emergency Planning attachment 1 of 2 CON_2018_01_04_from_Emergency_Planning_attachment_1_of_2.pdf
from Emergency Planning attachment 2 of 2 CON_2018_01_04_from_Emergency_Planning_attachment_2_of_2.pdf
from Emergency Planning cover email CON_2018_01_04_from_Emergency_Planning_cover_email.pdf
from Historic England CON_2018_01_11__from_Historic_England.pdf
from Landbeach Parish Council CON_2018_01_12_Landbeach_PC.pdf
Appendix A - Council approval of SCI outline strategy SUBDOC1_2018_01_17_Part_5_SCI_Appendix_A.pdf
Appendix B - Amey proposal document SUBDOC1_2018_01_17_Part_5_SCI_Appendix_B.pdf
Appendix C - Amey process flow SUBDOC1_2018_01_17_Part_5_SCI_Appendix_C.pdf
Appendix D - Residents letter public exhibition notification SUBDOC1_2018_01_17_Part_5_SCI_Appendix_D.pdf
Appendix E - Poster of public exhibition notification SUBDOC1_2018_01_17_Part_5_SCI_Appendix_E.pdf
Appendix F - Press release of public exhibition notification SUBDOC1_2018_01_17_Part_5_SCI_Appendix_F.pdf
Appendix G - Advert of public exhibition notification SUBDOC1_2018_01_17_Part_5_SCI_Appendix_G.pdf
Appendix H - Newsletter SUBDOC1_2018_01_17_Part_5_SCI_Appendix_H.pdf
Appendix I - General Enquiries received to 30 Nov 2017 SUBDOC1_2018_01_17_Part_5_SCI_Appendix_I.pdf
Appendix J - Parish Council Correspondence SUBDOC1_2018_01_17_Part_5_SCI_Appendix_J.pdf
from the Environment Agency CON_2018_01_22_from_Environment_Agency.pdf
from Old West Internal Drainage Board CON_2018_01_10_from_Old_West_IDB.pdf
from Haddenham Parish Council CON_2018_01_18_from_Haddenham_PC.pdf
from Natural England CON_2018_01_18_from_Natural_England.pdf
from PCC Wildlife Officer CON_2018_01_19_from_PCC_Wildlife_Officer.pdf
from the Wildlife Trust CON_2018_01_22_from_the_Wildlife_Trust.pdf
Noise Assessment Review CON_2018_01_26_Noise_Assessment_Review.pdf
from Cottenham Parish Council CON_2018_02_05_from_Cottenham_Parish_Council.pdf
from County Councils Air Quality Consultant CON_2018_02_06_from_County_Councils_Air_Quality_Consultant.pdf
from South Cambs DC - Consultee Comments CON_2018_02_13_from_SCDC_part_3_of_3.pdf
from South Cambs DC - Letter CON_2018_02_13_from_SCDC_part_1_of_3_Letter.pdf
from South Cambs DC - Report CON_2018_02_13_from_SCDC_part_2_of_3_SCDC_Officer_Report.pdf
from Cambs Fire & Rescue CON_2018_02_13_from_Cambs_Fire_&_Rescue_Service.pdf
from English Heritage CON_2018_02_06_from_English_Heritage_Trust.pdf
from Wicken Fen Parish Council CON_2018_02_14_from_Wicken_Parish_Council.pdf
from Historic Environment Team CON_2018_02_15_from_Historic_Environment_Team_on_Archaeology.pdf
from Waterbeach Parish Council CON_2018_02_07_from_Waterbeach_Parish_Council.pdf
from Transport Assessment Team CON_2018_01_29_from_Transport_Assessment_Team.pdf
from Haddenham Parish Council CON_2018_02_19_from_Haddenham_PC_(2).pdf
from Campaign to Protect Rural England CON_2018_02_20_from_CPRE.pdf
from Highway Authority CON_2018_02_20_from_Highway_Authority_re_construction_traffic.pdf
from Haddenham Parish Council (2) CON_2018_02_19_from_Haddenham_PC_(2).pdf
from Public Health England CON_2018_02_21_from_Public_Health_England.pdf
from Cambridge Airport CON_2018_02_22_from_Cambridge_Airport_stating_red_light_not_reqd.pdf
from Landscape Partnership CON_2018_02_27_Report_by_The_Landscape_Partnership.pdf
Anonymous Neighbour Responses Report - 6 Feb 2018 NEIGH_2018_03_16_Anonymous_Neigh_Reps_to_6_Feb_18.pdf
from East Cambs District Council CON_2018_03_23_from_East_Cambs_District_Council.pdf
Clarification email to Agent SUBDOC2_2018_04_24_Clarification_E-mail_sent_to_Agent_by_CCC.pdf
Regulation 22 Additional Environmental Information Report SUBDOC2_2018_04_24_Regulation_22_Additional_Environmental_Information_Report.pdf
Regulation 22 Appendix 1.1 NTS SUBDOC2_2018_04_24_Regulation_22_Appendix_1.1_NTS.pdf
Regulation 22 Appendix 2.1 Fencing and Gating Plan SUBDOC2_2018_04_24_Regulation_22_Appendix_2.1_PL18_Fencing_and_Gating_Plan_(RevA).pdf
Regulation 22 Appendix 2.2 Updated Noise Maps SUBDOC2_2018_04_24_Regulation_22_Appendix_2.2_Updated_Noise_Maps.pdf
Regulation 22 Appendix 3.1 AQ response to AQC FINAL SUBDOC2_2018_04_24_Regulation_22_Appendix_3.1_AQ_Response_to_AQC_FINAL.pdf
Regulation 22 Appendix 7.1 Lighting Assessment SUBDOC2_2018_04_24_Regulation_22_Appendix_7.1_Lighting_Assessment.pdf
Regulation 22 Figure 5.1 Preliminary Planting Strategy SUBDOC2_2018_04_24_Regulation_22_Figure_5.1_Preliminary_Planting_Strategy.pdf
Regulation 22 Figure 5.2 Indicative Alignment of Access Road SUBDOC2_2018_04_24_Regulation_22_Figure_5.2_Indicative_Alignment_of_Access_Road.pdf
Regulation 22 Figure 5.3 Flood Zone Mapping SUBDOC2_2018_04_24_Regulation_22_Figure_5.3_Flood_Zone_Mapping.pdf
Regulation 22 Heritage Assets within 1km SUBDOC2_2018_04_24_Regulation_22_Figure_5.4_Heritage_Assets_within_1km.pdf
Regulation 22 SK01 Residential Receptor Location Plan Rev A SUBDOC2_2018_04_24_Regulation_22_RERC_SK-01_-_Residential_Receptor_Location_Plan_REV_A.pdf
Regulation 22 SK02 Ecological Receptor Location Plan Rev A SUBDOC2_2018_04_24_Regulation_22_RERC_SK-02_-_Ecological_Receptor_Location_Plan_REV_A.pdf
Regulation 22 SK03 Heritage Receptor Location Plan Rev A SUBDOC2_2018_04_24_Regulation_22_RERC_SK-03_-_Heritage_Receptor_Location_Plan_REV_A.pdf
Regulation 22 SK04 Light Monitoring Location Plan Rev A SUBDOC2_2018_04_24_Regulation_22_RERC_SK-04_-_Light_Monitoring_Location_Plan_REV_A.pdf
Regulation 22 SK05 Outline Scheme of Lighting SUBDOC2_2018_04_24_Regulation_22_RERC_SK-05_-_Outline_Scheme_of_Lighting.pdf
Regulation 22 SK06 Light Spill Rev B SUBDOC2_2018_04_24_Regulation_22_RERC_SK-06_-_Light_Spill_REV_B.pdf
Clarification Appendix A Water flow diagram SUBDOC2_2018_04_25_Clarification_Appendix_A_Water_flow_diagram.pdf
Clarification Appendix B Response to UKWIN Comments SUBDOC2_2018_04_25_Clarification_Appendix_B_Response_to_UKWIN_Comments.pdf
Clarification Appendix C Part 5 SCI Report Updated 1 of 2 SUBDOC2_2018_04_25_Clarification_Appendix_C_Part_5_SCI_REPORT_UPDATE_200418_part_1_of_2.pdf
Clarification Appendix C Part 5 SCI Report Updated 2 of 2 SUBDOC2_2018_04_25_Clarification_Appendix_C_Part_5_SCI_REPORT_UPDATE_200418_part_2_of_2.pdf
Clarification Appendix D Process and Emissions Overview SUBDOC2_2018_04_25_Clarification_Appendix_D_Process_and_Emissions_Overview.pdf
Clarification Appendix E Air Quality and Emissions QA SUBDOC2_2018_04_25_Clarification_Appendix_E_Air_Quality_and_Emissions_QA.pdf
Clarification Appendix F Air Quality Clarification SUBDOC2_2018_04_25_Clarification_Appendix_F_Air_Quality_Clarifications.pdf
Clarification Appendix G Noise Clarifications SUBDOC2_2018_04_25_Clarification_Appendix_G_Noise_Clarifications.pdf
Clarification Figure 1 Fire Strategy SUBDOC2_2018_04_25_Clarification_Figure_1_Fire_Strategy.pdf
Clarification Figure 2 Fire Strategy SUBDOC2_2018_04_25_Clarification_Figure_2_Fire_Strategy.pdf
Clarification Figure 3 Example Images of Tanker and Trailer SUBDOC2_2018_04_25_Clarification_Figure_3_Example_Images_of_Tanker_&_Trailer.pdf
Clarification Figure 4 Contingency Shredder Location SUBDOC2_2018_04_25_Clarification_Figure_4_Contingency_Shredder_Location_(tbc).pdf
Clarification Letter SUBDOC2_2018_04_25_Clarification_Letter.pdf
Neighbour Reps Received 7 Feb to 29 May NEIGH_2018_07_12_Neigh_Reps_Received_7_Feb_to_29_May_2018.pdf
Reg22 from Old West IDB CON_2018_05_02_from_Old_West_IDB.pdf
Reg22 from Anglian Water CON_2018_05_03_from_Anglian_Water.pdf
Reg22 from LLFA CON_2018_05_09_from_CCC_Floods_&_Water.pdf
Reg22 from Haddenham Parish Council CON_2018_05_10_from_Haddenham_Parish_Council.pdf
Reg22 from PCC Wildlife Officer CON_2018_05_10_from_PCC_Wildlife_Officer.pdf
Reg22 from Historic England CON_2018_05_14_from_Historic_England.pdf
Reg22 from The Landscape Partnership CON_2018_05_14_from_The_Landscape_Partnership.pdf
Reg22 from Natural England CON_2018_05_16_from_Natural_England.pdf
Reg22 from Burwell Parish Council CON_2018_05_17_from_Burwell_PC.pdf
Reg22 from Public Health England CON_2018_05_24_from_Public_Health_England.pdf
Reg22 from Waterbeach Parish Council CON_2018_05_24_from_Waterbeach_PC.pdf
Reg22 from English Heritage CON_2018_05_25_from_English_Heritage_Trust.pdf
Reg22 from Air Quality Consultants CON_2018_05_29_from_Air_Quality_Consultants.pdf
Reg22 from Cottenham Parish Council CON_2018_05_29_from_Cottenham_Parish_Council.pdf
Reg22 from Environment Agency CON_2018_05_29_from_Environment_Agency.pdf
Reg22 from Historic England additional information CON_2018_05_29_from_Historic_England_additional_response.pdf
Reg22 from Landbeach Parish Council CON_2018_05_29_from_Landbeach_Parish_Council.pdf
Reg22 from South Cambs District Council CON_2018_05_29_from_SCDC.pdf
Reg22 from Director of Public Health CON_2018_06_04_from_Director_of_Public_Health.pdf
Reg22 from Histon and Impington Parish Council CON_2018_06_04_from_Histon_and_Impington_Parish_Council.pdf
Reg22 from East Cambs District Council CON_2018_06_07_from_East_Cambs_District_Council.pdf
Reg22 from Fire and Rescue Service CON_2018_06_15_from_Fire_and_Rescue_Service.pdf
Reg22 from Noise Consultant CON_2018_06_15_from_Noise_Consultant.pdf
Reg22 from Wilburton Parish Council CON_2018_06_21_from_Wilburton_Parish_Council_late_rep.pdf
Reg22 from Heidi Allen MP CON_2018_07_27_from_Heidi_Allen_MP_(late_rep).pdf
Agent response to UKWIN - second response of 24 May 2018 SUBDOC3_2018_08_01_Agents_response_to_UKWIN_second_response_of_24_May_2018.pdf
Updated Carbon Assessment SUBDOC3_2018_08_01_Updated_Carbon_Assessment.pdf
from Girton Parish Council CON_2018_08_31_from_Girton_Parish_Council_(late_rep).pdf
Neighbour Reps Received 30 May to 6 Sept NEIGH_2018_09_06_Neigh_Reps_30_May_to_6_Sept_2018_v2.pdf
Enviromental Statement V2 Fig 4.5 3D Representations SUBDOC0_2017_12_19_ES_V2_Fig_4.5_3D_Representations.pdf
Enviromental Statement V2 Fig 4.8 Preliminary Drainage Design SUBDOC0_2017_12_19_ES_V2_Fig_4.8_Preliminary_Drainage_Design.pdf
Applicant's Visualisation Methodology for TLP SUBDOC4_2018_02_09_Applicants_visualisation_methodology_for_TLP.pdf
Neighbour Reps Received 7 Sept to 10 Sept NEIGH_2018_09_11_Neigh_Reps_7_Sept_to_10_Sept_2018.pdf
from Lucy Frazer MP CON_2018_09_13_from_Lucy_Frazer_MP_late_rep.pdf
Decision Notice DEC_2018_09_21_Decision_Notice.pdf
EIA Press Notice DEC_2018_09_28_EIA_press_notice_text_FINAL.pdf
EIA Statement DEC_2018_09_28_EIA_Statement_text_FINAL.pdf

 

HTS Name: wphappdetail03-default.hts
Logical ID: WPHAPPDETAIL
jquery.js